MEPFIn progress2026
MEPF consultancy for a 40-bed day-care facility
Built-up area
12,000 sq ft
Configuration
G+2
Duration
10 months
Location
Ajmer Road, Jaipur
MEPF design and site supervision for a day-care medical facility, where air changes, medical gas routing and fire compartmentation drive the whole plan.
The challenge
Healthcare air-change requirements and medical gas distribution in a building whose structural grid was already fixed.
Our approach
Full services coordination against the existing structure, with a corridor-based distribution spine that keeps all maintenance access out of clinical areas.
The outcome
In progress — design issued, first fix underway.
HealthcareMedical gasAir changesIn progress